Hi Folks,
We are running 2 vCenters with only 1 External PSC. If Site A goes down (this is the vCenter where PSC resides) would failing over the PSC to the Secondary site work? Or do we need a separate PSC for the Secondary Site? If we require a separate PSC would it work by replicating the PSC data from Site A to this or would it need to be it's only complete entity? We are running Enhanced Linked Mode with the 2 vCenters.